5492 Perrin & Rowe Hoxton 3-Way (1 Inlet, 2 Outlet) Diverter with Shut-Off Control and Lever Handle

5492 Perrin & Rowe Hoxton 3-Way (1 Inlet, 2 Outlet) Diverter 5492 Perrin & Rowe Hoxton 3-Way (1 Inlet, 2 Outlet) Diverter

£383.00 inc VAT

You save £95.80

Quantity
-
+

Available Finishes

    Buy with confidence from the UK’s largest online supplier of Perrin & Rowe

    • Established 37 years
    • 5 year manufacturer parts guarantee
    • 1 year finish guarantee
    • Timed deliveries and simple, clear returns
    • We offer a friendly and professional service
    • Genuine pricing and promotions
    • Large Project? Request a Quote

    Description

    The 5492 Perrin & Rowe Hoxton 3-Way (1 Inlet, 2 Outlet) Diverter with shut-off control and lever handle is usually available from stock and delivered in 3 - 7 days when specified in Chrome, Nickel and Pewter. This diverter valve is also available to purchase in a range of other finishes including brass, bronze and gold finishes.

    This 3-way (1 inlet, 2 outlet) diverter with shut-off control includes a unique lever handle construction with integral bearing ring, with ceramic disc flow control.

    • Handcrafted in the UK
    • Solid brass construction
    • Vernier insert for accurate handle alignment
    • 1°C to 70°C temperature range
    • 0.5 bar to 5 bar recommended supply pressure

    Specification

    • Room: Bathroom
    • Product Type: Shower Valve
    • Collection: Hoxton
    • Finish: Chrome
    • Mounting: Wall Mounted
    • Pipework: Concealed
    • Handle Type: Lever
    • Number of Outlets: 2
    • Width: 50mm
    • Height: 110mm
    • Brand: Perrin & Rowe
    • Condition: New
    • Product Code: 5492CP

    Drawings

    Lead Times

    Chrome
    3-7 Days
    Nickel
    3-7 Days
    Pewter
    3-7 Days
    English Bronze
    8-12 Weeks
    Gold
    8-12 Weeks
    Polished Brass
    8-12 Weeks
    Satin Brass
    8-12 Weeks
    Aged Brass
    8-12 Weeks

    Chrome, Nickel and Pewter finish products are usually available from stock and have a lead time of 3-7 days from the date of order. Products in Chrome, Nickel and Pewter that are not in stock have a lead time of 6 to 8 weeks. These finishes are our most popular finishes, so tend to be restocked on an on-going basis – please contact us for lead time details as required.

    Other finishes are typically made to order, and are therefore on a longer lead time of 8-12 weeks, however this is subject to manufacturing processes and should be considered an indicative timeframe.

    In the event that any of these finishes are on a temporarily longer lead time, we will notify you via e-mail upon receipt of your order. If you require your products urgently, please contact us on 01603 558277, or by email at info@just-perrin.co.uk and we will be very pleased to assist.

    Available Finishes